METHODS OF FINANCING AND PRICING OF DEVELOPMENT - DESIGN DEVELOPMENT OF AERONAUTICAL ENGINEERING DEFENSE
The evaluation of the cost of development - development (R & D) at the conclusion of the state contract is proposed to conduct an estimated price of the replacement steps of the current standard OCD OCD stages, which are adequate and include several stages. At each stage, the limit is determ...
Saved in:
Main Authors: | V. P. Panagushin, V. Y. Ivanisov |
---|---|
Format: | article |
Language: | RU |
Published: |
Real Economics Publishing House
2015
|
Subjects: | |
Online Access: | https://doaj.org/article/647787ae6bbf4a2eab976b73e44fbaac |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Iteration Method for Evaluation of the Price of a Government Contract for Designing Defense Aviation Equipment
by: V. P. PANAGUSHIN, et al.
Published: (2017) -
ANTIRECESSIONARY ORGANIZATIONAL-ECONOMIC APPROACHES TO THE MODERN SCIENCE INTENSIVE DEFENSE ARTICLES PRICE FORMATION
by: V. Y. Ivanisov
Published: (2014) -
«MANUAL» REGULATION OF PRICES FOR MILITARY GOODS: SPECIAL FEATURES AND MECHANISMS OF PROMPT REDUCTION
by: А. M. Moskovsky
Published: (2014) -
Technical Analysis of Tourism Price Process in the Eurozone
by: Sergej Gričar, et al.
Published: (2021) -
Cross-subsidizing in power industry: approaches to development of stage-by-stage decrease in volumes
by: A. V. TRACHUK, et al.
Published: (2017)