Development of a Virtual Metering System Application for High Water Cut Wells with Electric Submersible Pumps (ESPS) – a Case Study for Quifa Field
Well surveillance is a mandatory requirement for reservoir characterization and production optimization that every asset must aim for. To guarantee constant monitoring of a single well, installing conventional multi-phases flow meters systems is necessary. As an alternative way, this paper presents...
Enregistré dans:
Auteurs principaux: | , , |
---|---|
Format: | article |
Langue: | EN FR |
Publié: |
EDP Sciences
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/ab4584ce18004c9fb215d0aeb17c695a |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Soyez le premier à ajouter un commentaire!