An Integrated Model of Train Re-Scheduling and Control for High-Speed Railway

The goal of train re-scheduling is redesigning the time when trains arrive at and depart from stations of a railway section, and train control problem refers to determining the operating mode for a train in a railway section. It is quite necessary to study the two problems together, and they can be...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Xuelei Meng, Yahui Wang, Li Lin, Lei Li, Limin Jia
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
Acceso en línea:https://doaj.org/article/fe0792745ef34b8e97268909beaa59fc
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!