An Integrated Model of Train Re-Scheduling and Control for High-Speed Railway

The goal of train re-scheduling is redesigning the time when trains arrive at and depart from stations of a railway section, and train control problem refers to determining the operating mode for a train in a railway section. It is quite necessary to study the two problems together, and they can be...

Full description

Saved in:
Bibliographic Details
Main Authors: Xuelei Meng, Yahui Wang, Li Lin, Lei Li, Limin Jia
Format: article
Language:EN
Published: MDPI AG 2021
Subjects:
Online Access:https://doaj.org/article/fe0792745ef34b8e97268909beaa59fc
Tags: Add Tag
No Tags, Be the first to tag this record!