An Integrated Model of Train Re-Scheduling and Control for High-Speed Railway
The goal of train re-scheduling is redesigning the time when trains arrive at and depart from stations of a railway section, and train control problem refers to determining the operating mode for a train in a railway section. It is quite necessary to study the two problems together, and they can be...
Guardado en:
Autores principales: | Xuelei Meng, Yahui Wang, Li Lin, Lei Li, Limin Jia |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/fe0792745ef34b8e97268909beaa59fc |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Are Chinese Executives Rewarded or Penalized by the Operation of High-Speed Railways?
por: Yu Chen, et al.
Publicado: (2021) -
The Role of Perceived Quality on High-Speed Railway Tourists’ Behavioral Intention: An Application of the Extended Theory of Planned Behavior
por: Zhiqiang Hou, et al.
Publicado: (2021) -
Deciphering Property Development around High-Speed Railway Stations through Land Value Capture: Case Studies in Shenzhen and Hong Kong
por: Weihang Gong, et al.
Publicado: (2021) -
Speed and Sustainability When Entering New Market
por: Gwang Seok Kim, et al.
Publicado: (2021) -
Advanced Warning System to Improve Safety at Train Grade Crossings
por: Joaquin Haces-Garcia, et al.
Publicado: (2021)